Pump Track Construction Beneath Bolte Bridge, Footscray Road, Melbourne

Yarra Contracting | West Gate Tunnel Project

As part of the West Gate Tunnel Project, Yarra Contracting delivered the construction of a purpose built pump track along Footscray Road, Melbourne, beneath Bolte Bridge. The project transformed an underutilised residual space beneath a major transport corridor into a functional community asset designed to encourage active use within a constrained urban environment.
 

The objective was to create a durable and safe recreational facility that maximised the available footprint while meeting strict construction tolerances and compliance standards.

Delivering Infrastructure Works in a Live Rail Corridor

As an experienced civil contractor working within Melbourne's major infrastructure corridors, Yarra Contracting approached the pump track build with the same rigour applied to large-scale transport projects, translating tight tolerances and structural constraints into a high-performing public asset.

Working beneath an active transport structure demanded careful coordination, disciplined staging, and strict adherence to quality control measures to achieve the required finish and performance outcomes within a confined and technically demanding site.

Scope of Works

The Bolte Bridge pump track project involved a highly detailed scope of civil and landscape works, including:
 

  • 3,000 square metres of asphalt, comprising approximately 500 tonnes of material installed entirely by hand

  • Crushed rock base preparation finished to a tolerance of 5 millimetres 2,500 square metres of exposed aggregate concrete

  • Detailed line marking

  • Installation of custom built furniture elements designed to complement the surrounding infrastructure

  • These works contributed to creating a durable, accessible, and visually cohesive public environment within the upgraded station precinct.
     

Every stage of the works demanded precision, with hand-laid asphalt and tight base tolerances critical to the track's long-term ride quality and durability.

Activating Melbourne's Underused Urban Spaces

The completed pump track now serves as a high quality public asset, contributing to Melbourne's evolving urban landscape by activating previously unused space beneath a major transport structure.
 

The project demonstrates Yarra Contracting's capability in delivering technically demanding civil works within complex environments, with a focus on precision, compliance, durability, and long term community value.
 

Yarra Contracting continues to support major infrastructure and public realm projects across Melbourne and Victoria, delivering high-quality civil outcomes for transport, recreational, and community infrastructure environments.

Frequently Asked Questions

1) What did Yarra Contracting build beneath Bolte Bridge in Footscray Road, Melbourne?
Yarra Contracting constructed a purpose built pump track beneath Bolte Bridge on Footscray Road, Melbourne, as part of the West Gate Tunnel Project, turning an underused residual space into a community recreational asset.

2) What was the scope of works for the pump track project?
The scope included 3,000 square metres of hand-laid asphalt (approximately 500 tonnes) over a crushed rock base finished to a 5 millimetre tolerance, 2,500 square metres of exposed aggregate concrete, detailed line marking, and custom built furniture elements.

3) Why was the asphalt installed entirely by hand?
Hand installation allowed the crushed rock base and asphalt surface to be finished to a tight 5 millimetre tolerance, which is essential for the ride quality, safety, and durability of a pump track surface.

4) How did Yarra Contracting manage construction beneath an active transport structure?
Yarra Contracting used careful coordination, disciplined staging, and strict quality control measures to deliver the works safely and to the required finish while operating beneath an active transport corridor as part of the wider West Gate Tunnel Project. and Deer Park Station.

Yarra Logo

Yarra Contracting is a Civil Construction company located in Melbourne certified by Kinaway Chamber of Commerce.

  • Facebook
  • Linkedin

Telephone: (03) 9484 4544

Email: mwebb@yarracontracting.com.au
Location: 15 Beaufort Street, Preston VIC 3072

©2026 Yarra Contracting Pty Ltd (ABN 21 630 880 910). All Rights Reserved.

bottom of page